Nov 16, 2023 22:09 JST

Source: Q2 Metals Corp

Q2 Metals Provides Drill Program Update at Its Mia Lithium Property, James Bay Territory, Quebec, Canada

Vancouver, British Columbia--(ACN Newswire - November 16, 2023) - Q2 Metals Corp. (TSXV: QTWO) (OTCQB: QUEXF) (FSE: 458) ("Q2" or the "Company") is pleased to provide an update on Phase 1 of its inaugural drill program at its wholly owned, 8,668-ha Mia Lithium Property (the "Property") located in the Eeyou Istchee James Bay Territory of Quebec.

The primary objective of Phase 1 of the drill program is to conduct initial drill testing of the Mia Lithium Exploration Trend (the "Mia Trend"), commencing at the Mia Zone on the west end of the Mia Trend and continuing along the nearly 10 km long trend, to the Carte Zone. Phase 1 of the drill program will continue with one active drill rig at the Mia Zone area and one active drill rig at the Carte Zone area.

"It's exciting to have our drill program underway to begin testing our initial targets at the Mia Trend," said Q2 CEO & President, Alicia Milne. "With the success of our condensed mapping and sampling program in September and the cooperation of the weather, the drill program will continue into December."

"Our initial drilling has vastly improved our understanding of the Property and as we expected, the results show a series of stacked, parallel pegmatite bodies in a similar geometry as the James Bay deposit of Allkem Inc.1," said Q2 VP Exploration, Neil McCallum. "We are interpreting this positively as drilling has also provided confirmation that the pegmatites are shallowly-dipping at between 25 and 30- degrees."

Cautionary Statement:

(1) Mineralization hosted on adjacent and/or nearby and/or geologically similar properties is not necessarily indicative of mineralization hosted on the Company's properties. As stated in a Sept-25, 2023 news release, the James Bay Feasibility study reports a Total Mineral Resource of 110.2 Mt at 1.30% Li2O, including 54.3 Mt at 1.30% Li2O in the Indicated Category, and 55.9 Mt at 1.29% Li2O in the Inferred Category, with a cut-off-grade of 0.4% Li2O.

Since beginning Phase 1 of the drill program on October 23, a total of 12 drill holes have been completed at the Mia Zone (8) and Carte Zone (4) for a total of 2,506 metres.

The geological team has completed the cutting and logging of holes MIA23-001 to MIA23-005 and the samples are currently being prepared for dispatch to the lab for analysis. The details of the first five holes are reported in detail, herein (Table 1). The basic information of the other seven holes that have not yet been logged in detail and cut is included below (Table 2).

Drilling commenced at the Mia Zone on the western end of the Mia Trend with holes MIA23-001 and MIA23-003 drilled as a scissor pair to build a greater structural understanding of the Mia Zone and assist in the identification of dip and dip direction and resulted in several pegmatite intercepts.

Holes MIA23-002 and MIA23-004 were also drilled as a scissor pair approximately 100m to the north of MIA23-001 and MIA23-003 and resulted in several pegmatite intercepts.

Hole MIA23-005 was drilled from the same section lines as MIA23-001 and MIA23-003 to test alternate dip direction and resulted in several pegmatite intercepts.

All five holes intercepted pegmatites with visual indications of spodumene mineralization identified2. All five holes will be shipped to the lab for mineral analysis to confirm the presence of lithium mineralization.

Cautionary Statement:

(2) The presence of pegmatites does not confirm the presence of lithium (spodumene or other lithium minerals). Pegmatites are fractionated coarse grained igneous rocks commonly associated with lithium mineralization; however, many pegmatites do not contain mineralization. The presence of any mineralization can only be confirmed with assaying.

Table 1- Pegmatite Interval Summary Holes MIA23-001 to 005

                             
  Hole number From (m) To (m) Length   Hole number From To Length   Hole number From To Length
 



MIA23-001
6.17 7.75 1.58  




MIA23-002
6.71 13.21 6.5  






MIA23-005
0 6.87 6.87
  55.04 55.7 0.66   18.72 24.28 5.56   18.25 18.8 0.55
  65.19 67.37 2.18   52.75 53.63 0.88   48.74 49.52 0.78
  83.8 85.04 1.24   60.09 60.74 0.65   67.65 69.77 2.12
  130.73 143.79 13.06   85.8 86.3 0.5   120.3 122.25 1.95
  147.87 148.93 1.06   88.47 92.74 4.27   143.48 144.29 0.81
  153.8 155.12 1.32   92.74 100.85 8.11   147.21 148.4 1.19
  177.58 178.12 0.54   110.97 112.24 1.27   151.23 151.86 0.63
  221.35 222.89 1.54   186.48 187.64 1.16   163.5 164 0.5
 
MIA23-003
58.65 63.43 4.78   190.1 191.44 1.34   187.74 215.25 27.51
  89.36 93.37 4.01   225.34 233.22 7.88   217.86 219.3 1.44
  215.13 215.93 0.8   234.33 247.19 12.86   220.31 227.18 6.87
         

MIA23-004
51.63 52.91 1.28   227.8 230.35 2.55
          131.61 133.54 1.93   232.02 233.31 1.29
          134.7 143.83 9.13   233.97 248.75 14.78
          145.16 149.44 4.28        
                             

 

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1454/187585_66c637ec24f75aa6_005.jpg

Figure 1- Summary Map of Drilling at Mia Zone

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/1454/187585_66c637ec24f75aa6_005full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1454/187585_66c637ec24f75aa6_006.jpg

Figure 2- A) Hole MIA23-002 near-surface pegmatite interval. B) Hole MIA23-004: coarse-grained spodumene crystals. C) Hole MIA23-005: spodumene-bearing pegmatite

To view an enhanced version of Figure 2, please visit:
https://images.newsfilecorp.com/files/1454/187585_66c637ec24f75aa6_006full.jpg

Table 2- Summary of Holes Completed to Date

Hole_ID Target Northing Easting Elevation (m) Azimuth DIP Hole Depth (m)
MIA23-001 Mia-1 5891137 302304 183.88 260 -45 227.35
MIA23-002 Mia-1 5891245 302353 174.83 260 -45 247.83
MIA23-003 Mia-1 5891132 302213 180.65 80 -45 217.57
MIA23-004 Mia-1 5891234 302302 176.57 80 -45 270.2
MIA23-005 Mia-1 5891136 302266 178 170 -90 248.75
MIA23-006 Mia-1 5891136 302266 178 170 -45 154.41
MIA23-007 CARTE 5893468 309794 162.4 145 -45 196.95
MIA23-008 Mia-1 5891208 302429 174.7 255 -45 269
MIA23-009 CARTE 5893468 309794 162.4 145 -85 126
MIA23-010 CARTE 5893442 309753 162.82 145 -45 201
MIA23-011 Mia-1 5891307 302454 166 260 -45 245
MIA23-012 CARTE 5893442 309753 162.82 145 -85 102
- Coordinates are in UTM NAD83, zone 18.          
- All holes are NQ-size diamond drill core.        
- Azimuth and dip are reported as planned, and will deviate down-hole.    

 

 

 

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1454/187585_66c637ec24f75aa6_008.jpg

Figure 3- Summary Map of Drilling at Carte Zone

To view an enhanced version of Figure 3, please visit:
https://images.newsfilecorp.com/files/1454/187585_66c637ec24f75aa6_008full.jpg

In preparation for Phase 2 of the program starting in the new year, the Company has received permits and began initial work on the preparation of a winter access trail. The winter trail is approximately 30 km in length, and it will extend site access from the Wemindji Access Highway through the Mia Zone and end at the Carte Zone.

Qualified Person

Neil McCallum, B.Sc., P.Geol, is a registered permit holder with the Ordre des Géologues du Québec and Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects, and has reviewed the technical information in this news release. Mr. McCallum is a director and VP Exploration of Q2.

About Q2 Metals Corp

Q2 Metals Corp. is a Canadian mineral exploration company currently advancing exploration of its 8,668-ha flagship Mia Lithium Property in the Eeyou Istchee James Bay Territory of Quebec, Canada which is host to the Mia Li-1 and Mia Li-2 lithium occurrences. The Company also owns the Stellar Lithium Property with 77 claims totaling 3,972-ha, located approximately six kilometres north of its Mia Lithium Property.

Q2 is also exploring the highly prospective Big Hill and Titan gold projects covering approximately 110 km² in the Talgai Goldfields of the broader Warwick-Texas District of Queensland, Australia, hosting 54 high-grade historical gold mines.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Alicia Milne
President & CEO
Alicia@Q2metals.com

Jason McBride
Corporate Communications
Jason@Q2metals.com

Telephone: 1 (800) 482-7560
E-mail: info@Q2metals.com

Follow the Company: Twitter, LinkedIn, Facebook, and Instagram

Forward-Looking Statements

This news release contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian legislation. Forward-looking statements are typically identified by words such as: "believes", "expects", "anticipates", "intends", "estimates", "plans", "may", "should", "would", "will", "potential", "scheduled" or variations of such words and phrases and similar expressions, which, by their nature, refer to future events or results that may, could, would, might or will occur or be taken or achieved. Accordingly, all statements in this news release that are not purely historical are forward-looking statements and include statements regarding beliefs, plans, expectations and orientations regarding the future including, without limitation, any statements or plans regard the geological prospects of the Company's properties and the future exploration endeavors of the Company. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those anticipated in such forward-looking statements. The forward-looking statements in this news release speak only as of the date of this news release or as of the date specified in such statement. Forward-looking statements in this news release includes, but is not limited to, the timing and completion of the Phase 1 drill program, the timing and preparation for the Phase 2 drill program, the scale, scope and location of future exploration and drilling activities, the focus of the Company's current and future drill programs, the Company's expectations in connection with the projects and exploration programs being metthe Company's objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, variations in ore grade or recovery rates, changes in project parameters as plans continue to be refined,unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same. Readers are cautioned that mineral exploration and development of mines is an inherently risky business and accordingly, the actual events may differ materially from those projected in the forward-looking statements. Additional risk factors are discussed in the section entitled "Risk Factors" in the Company's Management Discussion and Analysis for its recently completed fiscal period, which is available under Company's SEDAR profile at www.sedarplus.ca.

Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking statements prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. Although the Company has attempted to identify important risks, uncertainties and factors which could cause actual results to differ materially, there may be others that cause results not to be as anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update this forward-looking information except as otherwise required by applicable law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/187585

Source: Q2 Metals Corp
Sectors: Metals & Mining

Copyright ©2024 ACN Newswire. All rights reserved. A division of Asia Corporate News Network.

Related Press Release


Q2 Metals Announces Grant of Equity Incentive Awards
December 20 2024 16:05 JST
 
Q2 Metals Announces Closing of the Acquisition of Additional Claims at the Cisco Lithium Property, James Bay, Quebec, Canada
December 18 2024 16:05 JST
 
Q2 Metals Announces Final Analytical Results from the 2024 Drill Campaign at the Cisco Lithium Property, James Bay, Quebec, Canada, and Proceeds of $1.9 Million from Warrant Exercises
December 17 2024 16:05 JST
 
Q2 Metals Drills 188.6 M Grading 1.56% Li2O, including 26 Metres of 2.03% Li2O, at the Cisco Lithium Property, James Bay, Quebec, Canada
December 09 2024 16:05 JST
 
Q2 Metals Significantly Expands the Cisco Lithium Property in James Bay, Quebec, Canada
November 26 2024 16:05 JST
 
Q2 Metals Drills 347.1 m at 1.35% Li2O Including 30 m at 1.76% Li2O at the Cisco Lithium Property, James Bay, Quebec, Canada
October 28 2024 15:05 JST
 
Q2 Metals Drills 215.6m at 1.69% Li2O including 64.6m at 2.29% Li2O at the Cisco Lithium Property, James Bay, Quebec, Canada
October 01 2024 15:05 JST
 
Q2 Metals Drills 188.6 M Interval of Continuous Spodumene-Pegmatite and Concludes the 2024 Summer Drill Campaign at its Cisco Lithium Property, James Bay Quebec Canada
September 24 2024 15:05 JST
 
Q2 Metals Clarifies Technical Disclosure
August 21 2024 10:00 JST
 
Q2 Metals Drills 120.3 M at 1.72% Li2O including 19.0 M at 2.06% in First Assays Reported from its Spring 2024 Drill Campaign at the Cisco Lithium Property, James Bay, Quebec, Canada
August 19 2024 15:05 JST
 
More Press release >>

Latest Press Release


More Latest Release >>